background image

–  1  –

Quick Start Guide

E072021-CS-R01

150200002419A

32-Port 400G Data Center Spine Switch

AS9726-32DB

1.

32-Port 400G Data Center Spine Switch AS9726-32DB 

2.

Rack mounting kit—2 front-post brackets, 2 rear-post brackets 
and ears, 20 screws, and 2 ear-locking screws

3.

Power cord (included with AC PSUs only)

4.

Console cable—RJ-45 to DE-9

5.

Documentation—

Quick Start Guide

 (this document) and 

Safety 

and Regulatory Information

1.

System LEDs and 1PPS timing port

2.

Management Ports: 1 x 1000BASE-T RJ-45, micro-USB/RJ-45 
console, USB

3.

32 x 400G QSFP-DD ports

4.

2 x 10G SFP+ ports

5.

Product label

6.

2 x grounding screws (maximum torque 10 kgf-cm (8.7 lb-in))

7.

2 x AC PSUs

8.

6 x fan trays

3

7

8

5

6

1

4

2

2. B2F Airflow

Install back-to-front (B2F) airflow 
fan trays (blue handles) and PSUs 
(blue release latches).

Fan Tray Replacement

1.

Pull the handle release latch.

2.

Remove fan tray from the 
chassis. 

3.

Install replacement fan with 
matching airflow direction.

PSU Replacement

1.

Remove the power cord.

2.

Press the release latch and 
remove the PSU. 

3.

Install replacement PSU with 
matching airflow direction.

1. F2B Airflow

Remove front-to-back (F2B) 
airflow fan trays (red handles) and 
PSUs (red release latches).

Package Contents

Overview

FRU Replacement

Airflow Reversal

Loc:

 Flashing Amber (switch locator)

Diag:

 Green (OK), Amber (no OS or fault)

PS1/PS2:

 Green (OK), Amber (fault)

Fan:

 Green (OK), Amber (fault)

Reset Button 

SFP+ 10G LEDs 

Left: Green (link)
Right: Green (10G), Amber (1G)

RJ-45 Mgmt LEDs

Left: Green (link)
Right: Green (activity)

QSFP-DD LEDs

400G: 1 LED Blue 
200G Breakout: 1 LED White, 

1-2 LEDs Green

100G Breakout: 1-4 LEDs Green
50G Breakout: 1 LED Cyan 

System LEDs/Buttons

Port LEDs

1

2

3

4

5

www.edge-core.com

*150200002419A_R01*

Reviews: