–
1
–
Quick Start Guide
1.
PSU LED:
Green (OK), Amber (fault)
2.
QSFP-DD Port LEDs:
Blue (400G), Cyan (200G), Green (100G),
Yellow (50G)
3.
QSFP28 Port LEDs:
Green (100G), Cyan (50G), Magenta (40G),
Blue (25G), Yellow (10G)
4.
SFP28 Port LEDs:
Blue (25G), Green (10G), Cyan (1G)
5.
System LEDs:
PSU1/2 — Green (OK), Amber (fault)
DIAG — Green (OK), Orange (fault detected)
FAN — Green (OK), Orange (fault)
LOC — Blinking Blue (OK)
ALARM — Green (OK), Red (alarm)
6.
RJ-45 Management Port LEDs:
Left (link), Right (activity)
7.
BITS/ToD LEDs:
Green (valid BITS), Blinking Green (1PPS ToD)
1
6
4
7
2
5
3
E052022-CS-R01
150200002489A
Ethernet Switch
AS7535-28XB
1.
AS7535-28XB (includes 2 PSUs and 6 fan trays)
2.
Rack Mounting Kit—2 brackets and 8 screws
3.
Grounding kit—grounding lug, 2 screws, and 2 washers
4.
(Optional) AC power cord
5.
Documentation—
Quick Start Guide
(this document) and
Safety
and Regulatory Information
Package Contents
Overview
FRU Replacement
1
Status LEDs
1.
2 x DC or AC PSUs
2.
2 x 100G QSFP28 ports
3.
2 x 400G QSFP-DD ports
4.
24 x 25G SFP28 ports
5.
Product tag
6.
Management I/O: 1000BASE-T RJ-45, RJ-45 console,
Micro-USB console, reset button
7.
BITS/ToD RJ-45 timing ports
8.
10MHz/1PPS I/O
9.
GNSS antenna
10.
USB Type C storage port
11.
RJ-45 alarm port
12.
6 x fan trays
13.
Grounding screw
1
12
4
7
11
6
13
5
9
10
8
2
3
www.edge-core.com
2
3
4
5
Fan Tray Replacement
1.
Loosen the fan tray screw.
2.
Pull out and remove the fan
tray.
3.
Install replacement fan tray.
PSU Replacement
1.
Remove the power cord.
2.
Press the release latch and
remove the PSU.
3.
Install replacement PSU.