Edge-Core AS5610-52X Quick Start Manual Download Page 1

–  1  –

Q u i c k   S t a r t   G u i d e

1. Unpack the Switch and Check Contents

10G Top-of-Rack Switch
AS5610-52X 

Rack Mounting Kit—Contains two brackets and eight 
screws

Grounding Wire (included with DC PSUs only)

Power Cord—either Japan, US, Continental Europe 
or UK (included with AC PSUs only)

Console Cable—RJ-45 to DB-9

Documentation—

Quick Start Guide

 (this document) 

and 

Safety and Regulatory Information

Note:

 For information on switch software, refer to 

www.edge-core.com

.

Switches with part numbers 5610-52X-D*-******** have 
switch software pre-loaded on the switch. Software user 
documentation can be found at 

www.edge-core.com

.

Switches with part numbers 5610-52X-O-******** have the 
Open Network Installer Environment software installer pre-
loaded on the switch, but no switch software image.  
Information about compatible switch software can be 
found at 

www.edge-core.com

.

Caution: 

The switch includes plug-in power supply and 

fan tray modules that are installed into its chassis. All 
installed modules must have a matching airflow direction. 
That is, all modules must have a front-to-back (F2B) airflow 
direction, or all modules must have a back-to-front (B2F) 
airflow direction. The airflow direction of PSU and fan tray 
modules is indicated by labels on the modules.

2. Mount the Switch

Attach the brackets to the switch.

Use the screws supplied with the rack to secure the switch in 
the rack.

Caution:

 Installing the switch in a rack requires two 

people. One person should position the switch in the rack, 
while the other secures it using the rack screws.

装置の吸排気に必要な領域を マニ ュ アル上に規定 し て
い る。

2

1

1

2

3. Ground the Switch

Ensure the rack on which the switch is to be mounted is 
properly grounded and in compliance with ETSI ETS 300 253. 
Verify that there is a good electrical connection to the 
grounding point on the rack (no paint or isolating surface 
treatment).

Attach a lug (not provided with AC PSUs) to an 18 AWG 
minimum grounding wire (not provided with AC PSUs), and 
connect it to the grounding point on the switch rear panel. 
Then connect the other end of the wire to rack ground.

Caution:

 The earth connection must not be removed 

unless all supply connections have been disconnected.

4. Connect Power

Install one or two universal AC or DC  power modules in the 
switch.
The switch supports up to two PSUs that must have the 
same matching airflow direction as the installed fan tray.

Connect an external AC or DC  power source to the modules.

5. Verify Switch Operation

Verify basic switch operation by checking the system LEDs.
When operating normally, the PSU1/PSU2, Diag, and Fan 
LEDs should all be on green.

1

2

1

2

1

2

1

2

1

1

E012016-CS-R02

150200000722A

www.edge-core.com

48-Port 10G Top-of-Rack Switch

AS5610-52X

Reviews: