background image

–  1  –

Q ui c k   St a r t   G u i d e

1. Unpack the Switch and Check Contents

AS4610-54T (B)

Rack Mounting Kit—two brackets and eight screws 

Four adhesive foot pads

Two Power Cords—either Japan, US, Continental 
Europe or UK

Console Cable—RJ-45 to DB-9

Micro-USB to Type A USB Cable

Documentation—

Quick Start Guide

 (this document) 

and 

Safety and Regulatory Information

Note:

 For information on switch software, refer to 

www.edge-core.com

.

Switches with part numbers 4610-54-O-******** have the 
Open Network Installer Environment software installer pre-
loaded on the switch, but no switch software image.  
Information about compatible switch software can be 
found at 

www.edge-core.com

.

Warning:

 For indoor use only. The switch, AC power, and 

all connected cables are not designed for outdoor use.

2. Mount the Switch

Attach the brackets to the switch.

Use the screws and cage nuts supplied with the rack to 
secure the switch in the rack.

Caution:

 Installing the switch in a rack requires two 

people. One person should position the switch in the rack, 
while the other secures it using the rack screws.

Note:

 The switch can also be installed on a desktop or shelf 

using the included adhesive rubber foot pads.

2

1

1

2

3. Ground the Switch

Ensure the rack on which the switch is to be mounted is 
properly grounded and in compliance with ETSI ETS 300 253. 
Verify that there is a good electrical connection to the 
grounding point on the rack (no paint or isolating surface 
treatment).

Attach a lug (not provided with PSU) to a #18 AWG minimum 
grounding wire (not provided with PSU), and connect it to 
the grounding point on the switch rear panel. Then connect 
the other end of the wire to rack ground.

Caution:

 The earth connection must not be removed 

unless all supply connections have been disconnected.

4. Connect Power

Install one or two universal AC PSUs in the switch.

Connect an external AC power source to the PSUs.

5. Verify Switch Operation

Verify basic switch operation by checking the system LEDs.
When operating normally, the PSU1/PSU2 and System LEDs 
should all be on green.

1

2

1

2

1

2

1

2

1

1

E102016-AP-R01

150200001512A

www.edge-core.com

48-Port GE Top-of-Rack Switch

AS4610-54T (B)

Reviews: