CleanFLEX
Installation and Activation
English v1.0.0
Copyright © 2018 Ecube Labs Co., Ltd. All Rights Reserved - Proprietary and Confidential.
Page 1: ...CleanFLEX Installation and Activation English v1 0 0 Copyright 2018 Ecube Labs Co Ltd All Rights Reserved Proprietary and Confidential...
Page 2: ...nguage in any form or by any means electronic mechanical magnetic optical chemical manual or otherwise without the prior written permission of Ecube Labs Co Ltd Notice This user manual is provided for...
Page 3: ...6 2 Installing CleanFLEX 7 2 1 Installation prerequisites 7 2 2 Installing CleanFLEX 8 3 Activating CleanFLEX 10 3 1 Checking CleanFLEX ON OFF status 10 3 2 Turning CleanFLEX ON 10 3 2 1 Prerequisites...
Page 4: ...n status and sends real time data to CleanCityNetworks CCN CleanFLEX telecommunicates with CCN through WCDMA networks Obtaining real time fill level data of bins allows you to take action ahead of tim...
Page 5: ...al specification The technical specifications of CleanFLEX are shown in the following table Specification Description Sensor parameter Technology Ultrasonic Range 2 400 cm 1 157 Resolution 1 cm 0 4 Da...
Page 6: ...anytypeofbinorcontainer ItiscomplementarytoCleanCUBEandcanbeinstalledinareasnotfeasibleforCleanCUBE installations DatafromCleanFLEXcanbeviewedonthesamesoftwaresolutionthatdisplaysdatafrom CleanCUBE Pr...
Page 7: ...d by installation location and environment It is recommended to install the bin with its base being perpendicular to the direction of ultrasonic wave emitted from the sensor If necessary rotate the ul...
Page 8: ...n appropriate installation location and method of the installation Ensure you have the following items before beginning the installation Stencil marker M6drillbit Powerdrill Torxdriver M6torxbolts 2EA...
Page 9: ...FLEX on the installation surface and tighten with screws from the other side 4 Make sure the sensor is facing and centered on the base of the bin 5 Adjust the angle of the ultrasonic sensor if necessa...
Page 10: ...iately after magnet is placed on the indent Power is OFF B If the LED light flashes 1 second after magnet is placed on the indent Power is ON 2 Remove the magnet after the LED light turns ON or flashe...
Page 11: ...er 5 flashes 3 Wait until LED light flashes again This process will take approximately 3 seconds 4 After LED light flashes place the magnet on again within 3 seconds 5 LED light will flash 5 times Rem...
Page 12: ...n the detector 2 1 After placing the magnet on the detector for 1 second the LED light will flash 1 time 2 2 After another second LED light will flash 2 times 2 3 After another second LED light will f...
Page 13: ...13 Avoid performing any procedures within ten minutes after turning CleanFLEX OFF If the user fails to perform the correct procedure while turning CleanFLEX OFF CleanFLEX will return to its previous...
Page 14: ...involume These dimensions are essential in creating bin profile for CleanFLEX on the CCN interface for receiving accurate sensor data from CleanFLEX If you fail to create bin profile for CleanFLEX on...
Page 15: ...pushing the bin liner against the inside of the bin to keep the bag away from the center of the bin 3 Fold the excess length of the bag over the outside of the bin The liner bag must be pushed comple...
Page 16: ...are found around the ultrasonic sensor remove them If the liner bag is not placed properly refer to 4 Bin profile and place the bag correctly Also check whether the ultrasonic sensor is physically da...
Page 17: ...ufacturer may void the user s authority to operate the equipment FCC RF Radiation Exposure Statement This equipment complies with FCC RF Radiation exposure limits set forth for an uncontrolled environ...
Page 18: ...ion est autoris e aux deux conditions suivantes 1 l appareil ne doit pas produire de brouillage et 2 l utilisateur de l appareil doit accepter tout brouillage radio lectrique subi m mesi le brouillage...