![ECR International UTICA BOILERS TRB4075 Installation, Operation & Maintenance Manual Download Page 11](http://html1.mh-extra.com/html/ecr-international/utica-boilers-trb4075/utica-boilers-trb4075_installation-operation-and-maintenance-manual_2356165011.webp)
11
NOTICE
Shut off manual fuel supply valve if burner is shut
down for extended period of time.
Figure 2 - General Requirements For A Typical Installation
RELIEF
VALVE
CHECK LOCAL CODES FOR
MAXIMUM DISTANCE FROM
FLOOR, OR OTHER ALLOWABLE
SAFE POINT OF DISCHARGE.
6 - INSTALLATION REQUIREMENTS
PN 240013278, Rev. A [12/31/2020]