25
Site Safety-
Site Safety is a very important part of your work ethics when working with EcoWater CHC. Site
Safety is required when you go to ANY Customer Site.
You MUST verify the following upon any attempt to work at a customer site:
1. You must be familiar with the Emergency Notifications systems used at the site.
2. You must be familiar with all Emergency Evacuation Routes as assigned by the
customer.
3. You must be familiar with all Emergency Notification Requirements as set forth by the
customer. This includes understanding who to contact upon an Emergency and/or
incident.
4. If the customer has any required safety training, you must be trained and follow all
training while at their location.
5. If the customer requires any special PPE, you must comply with that request before
any work is conducted.
6. You must notify the customer of your intent to work on the equipment at the site, and
the customer must know your location at all times, while on the customer’s premises.
7. You are not allowed to do any work at a site without the customer being aware of your
presence at their facility.
8. All PPE must be up to date and inspected before use, do not assume that its protection
and/or function is adequate and safe. This includes any customer supplied PPE.
9. You must utilize the PPE as instructed.
10. You must notify the customer of any possible Hot Work, and/or use of Hazardous
materials while on site, and make sure you have their approval and have met the site’s
safety requirements before any work is done. The customer and you must have a
copy of any intended use chemical’s MSDS sheet.
11. You will not enter any Confined Spaces without customer approval or without the use
of appropriate ventilation and or testing equipment.
12. You will not perform any Hot Work without an appropriate fire suppression system
within arm’s reach. Any Hot Work inside of a Cooling Tower requires you to have
used the appropriate methods of fire control and monitoring. If a penetration is being
made in a tower, you must have an observer on the outside of the tower to monitor for
fire hazards.
13. Never work on electricity if you do not have the appropriate equipment, training, or it
is raining.
Summary of Contents for CHC Series
Page 1: ...Basics of Service and Troubleshooting ...
Page 36: ...36 ...
Page 37: ...37 ...
Page 77: ...77 Hard Scale from tubes that is hard like Glass ...
Page 82: ...82 6 2 Conductivity Controllers Walchem and LMI ...
Page 83: ...83 ...
Page 84: ...84 ...
Page 101: ...101 6 10 Water Sampling Instructions ...
Page 111: ...111 ...
Page 120: ...120 ...
Page 121: ...121 Eco Water CHC ...
Page 122: ...122 6 15 Electrical Schematics EcoWater CHC ...
Page 123: ...123 CHC EcoWater CHC CHC CHC ...
Page 124: ...124 EcoWater CHC ...
Page 125: ...125 EcoWater CHC ...
Page 126: ...126 EcoWater C HC ...
Page 127: ...127 CHC ...
Page 128: ...128 ...