19.3 Inserting cable and securing with strain relief
Secure the power cable in the foundation using the cable gland.
Connect the conductors of the cable to the existing main switch terminals (max. 15
to 22
Nm
bolt m8 oder 30
to 44
Nm bolt s10).
Below is an overview of the wiring diagram
19.4 Load balancer
If you want to install the charging station in combination with a load balancer you must
connect it to the charging station in the following way.
The installation instruction of the charging station in the fuse box can be found in the
manual of the load balancer itself.
The data cable from the load balancer must be connected to the gray clip (see drawing).
Loadbalancing is in devolopment, but not yet possible!