4
Installation and commissioning
4
Installation and commissioning
This section contains information on installing and commissioning the product.
4.1
Prerequisites
The following equipment is required to install and set up the product:
Installation
•
Various power tools
•
Torque wrench
•
Socket driver set
•
Battery-powered light source
Setting up with ecoSetupTool and support
•
Internet
•
Laptop
•
Micro-SD card reader (often comes as standard in laptops)
4.2
Positioning the ecoBatterySystem
Prerequisites
➯
The components are supplied separately and complete (see chapter 3.2 "Scope of delivery").
ATTENTION
Fire safety
•
The ecoBatterySystem must be installed in a fireproof room with zero fire loading and a
category F30 fire door.
•
The ecoBatterySystem must not be installed in rooms with potentially explosive
atmospheres.
ATTENTION
Floor conditions
The floor must satisfy the following requirements:
Floor loading
°
ecoBatterySystem Small: at least 300 kg / 0.5 m
2
°
ecoBatterySystem Large: at least 600 kg / 0.5 m
2
•
The floor must have a firm surface.
•
The floor must be clean and level.
ATTENTION
Inadequate ventilation
The ecoBatterySystem may overheat
•
Do not obstruct the ventilation slots
•
Maintain clearances
°
Clearance to the rear: min. 10 cm
°
Clearance to the sides: min. 20 cm
°
Clearance above: min. 20 cm
°
Clearance below: determined by the feet