
IAQH-1000 Manual
b.
How to Install the Product
The installation must conform with local codes or in the absence of local codes with the
Standard for the Storage and Handling of Liquified petroleum Gases, ANSI/NFPA 58 and/or
the National Standards of Canada CAN/CGA B149.2/3 installation codes. The heater must
be located more than ten (10) feet (3.05 meters) away from the propane source or propane
tank. When the heater is not in use, ensure to shut off the gas supply from the gas source.
i.
Packaging contents
The standard IAQH-1000 system comes equipped with the base unit and is ready for use with the
following factory accessories:
Additional Options:
●
Remote Thermostat
●
20” Return Air Ducting
●
24” High Temperature Ducting
●
Duct Hold Down Ring
●
Gas Hose
●
Second Stage Regulation System
38
Summary of Contents for IAQH Series
Page 2: ...2 Eco Power Equipment Ltd ...
Page 21: ...IAQH 1000 Manual 21 ...
Page 22: ...IAQH 1000 Manual 22 ...
Page 50: ...IAQH 1000 Manual Gas Connection and Burner Setup FIgure GT1 50 ...
Page 56: ...IAQH 1000 Manual Figure RTC Figure Midco 1 56 ...