
IAQH-1000 Manual
●
Examples of Misuse:
o
Permanent Heating Applications
o
Connecting the unit to inappropriate voltage or gas pressure
o
Operating the machine in a manner that is inconsistent with any federal,
provincial, or local codes and regulations
o
Operating the machine outside of factory specifications
o
Operating the machine in a manner inconsistent with any warnings found on the
machine or in the Operator’s Manual
●
This machine has been designed and built in accordance with the latest Canadian
and US safety standards. It has been engineered to eliminate hazards as far as
practicable and to increase operator safety through protective guards and labeling.
However, some risks may remain even after protective measures have been taken.
They are called residual risks. On this machine, they may include exposure to:
o
Electric shock and arc flash
o
Flammable gases and fire or flame hazards
iv.
Personal protective Equipment
●
Always work with appropriate personal protective equipment, high voltage and
natural or propane gas are present.
●
Follow all jobsite PPE recommendations and requirements specific to your local
jobsite.
●
Apply appropriate personal protective equipment (PPE) and follow safe electrical
work practices. See NFPA 70E, CSA Z462, or NOM-029-STPS.
v.
Product limitations and restrictions
●
This equipment must only be installed and serviced by qualified personnel.
●
The intended use is the temporary heating of a building or structure under
construction, alteration, or repair — it has been designed to provide continuous
heating and air quality management for buildings and structures in the construction
phase.
29
Summary of Contents for IAQH Series
Page 2: ...2 Eco Power Equipment Ltd ...
Page 21: ...IAQH 1000 Manual 21 ...
Page 22: ...IAQH 1000 Manual 22 ...
Page 50: ...IAQH 1000 Manual Gas Connection and Burner Setup FIgure GT1 50 ...
Page 56: ...IAQH 1000 Manual Figure RTC Figure Midco 1 56 ...