
Firmware V1.4
20.05.2021
62/113
1.
2.
3.
4.
5.
6.
7.
6.4 Quick Commissioning
This chapter is a guide for quick commissioning.
Step 1: Connect hardware completely
Set the CAN bus address (122..125); see chapter
Setting the CAN Bus Address Using Decade Switch S2
.
Configure the DIP switches; see chapter
Einstellungen über DIP-Schalter S1
.
Connect the temperature sensors; see chapter
Terminal Assignment of the Analogue Inputs
Connect the analogue inputs; see chapter
Terminal Assignment of the Analogue Inputs
.
Connect the controller completely (
, etc.)
.
Start LDSWin, connect to the system centre and load the configuration file (glt.cfg);
for details see chapter
.