
NPT-1020 Installation and Maintenance Manual
Installing Equipment
ECI Telecom Ltd. Proprietary
4-14
3.
Connect the lug at one end of the grounding lead to the RAP-4B grounding studs, using spring
washers and nuts.
Figure
4-11: RAP-4B with grounding cable
4.
Connect the two-hole lug at the other end of the grounding lead to the rack's grounding bar.
To connect DC input power cables to the RAP-4B:
1.
Before starting, identify the openings used to route power cables to the RAP-4B, as shown in the
following figure.
Figure
4-12: Identifying RAP-4B cable routes
2.
Open the two captive screws fastening the RAP-4B front cover and remove it.