background image

 

 

4U96 System Quick Guide 

 

 

 

 

8. 

Setup the Rail Kit. 

The 4U96 enclosure has a depth of 

42 inches. Adjust the slide rail housing that best fit your rack 

depth. See below for the placement suggestions. Slide rail is 

extendable to reach the rack post. Secure the slide rail housing 

with screws (red circles). 

40 - 42"

32 - 36"

Re

ar

Fr

on

t

 

9. 

Place the unit to the rack. 

Beforehand, notice the 

locations of the enclosure’s ear and slide rail screw holes when 

applying the square nuts to the rack posts.  

Afterwards, align the sliding rails to the back posts of the rack 

and apply the screws to the square nuts.  Screw secure  the 

enclosure ears to the front posts. 

 

1U

2U

3U

4U

1U

2U

3U

4U

Rear

Front

 

Caution: 

At least three  people are required to mount  the 

chassis to the rack. 

 

10. 

Install the drawers to the enclosure. 

  

 

 

11. 

To remove drawers,

 see the following: 

1. Hold the 

drawer handle

2. Lift the drawer 

latch upward

3. Pull the 

drawer out

4. On halfway out, press the 

side latch to fully release the 

drawer from the enclosure

 

 

12. 

Connect to a host. 

Connect HD-SAS cable between 

the UP port on the master expander and the SAS port of the 

host’s HBA or RAID controller. See the following illustration for 

a sample of recommended configurations: 

 

 

 

 

 

 

 

4U96

SAS UP Port A

SAS UP Port B

SAS DOWN Port A
SAS DOWN Port B

Host

RAID / HBA

4U96 (optional)

SAS UP Port A

SAS UP Port B

SAS DOWN Port A
SAS DOWN Port B

SA

S e

xpa

ns

ion

 ca

bl

e

SAS cable

(optional)

(o

ptio

nal

)

---- Optional cables are 

for bandwidth increase

 

 

13. 

Apply power connectors

 to the back of the 

enclosure. Note the power connector numbering.

 

A1

A2

A3

 

 

14. 

Power on the unit. 

Plug in the AC power cords to 

the AC receptacles of the Power Center and press the power 

button on the back of the enclosure. 

 

15. 

Turn on the hard drives.  

The host’s RAID controller will send a signal to turn on all 96 

drives of the enclosure upon system power up.  

If HBA is used, there will be cases where hard drives are not 

powered up by the time power is applied to the enclosure.  

 

 

 

 

 

 

 

To power on the disks: 

1.

 

Connect a serial cable to the management port  

2.

 

Open console terminal (e.g. HyperTerminal) with baud 

setting 38400, 8, N, 1, N 

3.

 

Type “con 1” to go to the first drawer (“con 0” is the 

master expander). 

4.

 

Type “t.dslot a” to turn on all the disk of that drawer 

5.

 

Go to Drawer 2 (type “con 2”), type “t.dslot a” to turn   

Drawer 2, and so on.  

Type “help” for the list of available commands. 

 

 

If you have any technical questions, please contact your authorized dealer before contacting us. 

For more information please visit our website at 

www.echostreams.com 

 

Reviews: