66
Chapter 4 •
Installation instructions
3500834-0001 Revision C
Exit pointing mode
1.
Short press the function button (<2 seconds) to exit pointing mode. The
terminal will initiate registration with the network.
2.
Verify the unit registers, attaches, and establishes a PDP context by checking
the status on the Web UI or when all three of the LEDs are solid green
(
on page 63).
3.
Optionally, verify the unit will correctly recover from a power cycle by
removing and reapplying power. Verify it registers, attaches, and establishes a
PDP context by again checking the status on the Web UI or when all three of
the LEDs are solid green (
on page 63).
4.
Verify end to end connectivity of the system, by sending a small amount of
data from the device connected to the 9502 and verifying that the data was
received by the other end (e.g., data center).
5.
Ensure both end caps have been re-installed and all four thumb screws on
each end cap are securely fastened to ensure the IP-66 integrity of the unit
once again.
Summary of Contents for HUGHES inmarsat 9502
Page 12: ...12 Understanding safety alert messages 3500834 0001 Revision C ...
Page 20: ...20 Chapter 1 Product description 3500834 0001 Revision C ...
Page 42: ...42 Chapter 2 Configuration via Web UI 3500834 0001 Revision C ...
Page 72: ...72 Chapter 6 AT unsolicited response codes 3500834 0001 Revision C ...