
SRM-410X
ASSEMBLY
X7502168400
19
© 11/20 ECHO Incorporated
Line Head Installation
1.
Install fixing plate (L) onto PTO shaft
(M).
2.
Align hole in fixing plate with notch in
edge of gear housing and insert head
locking tool (N)
3.
Thread line head (O) onto PTO shaft
by turning it counterclockwise until
head is tight against fixing plate.
Balance and Adjust Unit
1.
Loosen harness clamp screw.
2.
Put on harness and attach unit
to harness.
L
M
N
O
N
A