background image

Operating instructions

A3G800-AO84-03

Translation of the original operating instructions

3. TECHNICAL DATA

3.1 Product drawing

All dimensions in mm.

1

Direction of air flow "V"

2

Max. clearance for screw 16 mm

3

Cable diameter min. 4 mm, max. 10 mm; tightening torque 2.5±0.4 Nm

4

Tightening torque 3.5 ± 0.5 Nm

Item no. 50392-5-9970 · ENU · Change 205336 · Approved 2020-07-16 · Page 4 / 13

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for A3G800-AO84-03

Page 1: ...ecialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The safety hazards associated w...

Page 2: ...system machine wait until all parts have come to a standstill DANGER Ejected parts Missing protective devices may cause balancing weights or broken fan blades to be ejected and cause injuries Take app...

Page 3: ...e In particular operating the device in the following ways is prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation...

Page 4: ...on of air flow V 2 Max clearance for screw 16 mm 3 Cable diameter min 4 mm max 10 mm tightening torque 2 5 0 4 Nm 4 Tightening torque 3 5 0 5 Nm Item no 50392 5 9970 ENU Change 205336 Approved 2020 07...

Page 5: ...100 000 Pa Data obtained at optimum efficiency level The ErP data is determined using a motor impeller combination in a standardized measurement setup 3 4 Technical description Weight 12 2 kg Size 800...

Page 6: ...ith the network operator that this device is only connected to a connection point with a Ssc value that is greater than or equal to 120 times the rated output of the arrangement 4 CONNECTION AND START...

Page 7: ...he protective earth terminal is located on the housing and provided with a protective earth symbol and a hole 4 2 2 Supply connection and fuses Assignment of supply cable cross sections and their requ...

Page 8: ...rewdriver to do so When connecting ensure that no wire ends fan out Fig 2 Connecting wires to terminals Seal the terminal box 4 3 3 Cable routing Water must be prevented from reaching the cable gland...

Page 9: ...ig 4 Cable routing for fans installed upright 4 4 Factory settings Factory settings made for the device by ebm papst Mode PWM control Group address 1 Fan device address 1 Max PWM 100 Min PWM 0 Save se...

Page 10: ...evel KL3 2 8 GND Reference ground for control interface SELV KL3 3 7 0 10 V Use control current sensor value input 0 10 VDC impedance 100 k only as alternative to 4 20 mA input SELV KL3 4 10 V Voltage...

Page 11: ...e for maintenance Switch off the device via the control input Do not switch the motor e g in cyclic operation on and off via power supply Disconnect the device from the power supply When disconnecting...

Page 12: ...aning To ensure a long service life check the fans regularly for proper operation and soiling The frequency of checking is to be adapted accordingly depending on the degree of soiling DANGER Risk of i...

Page 13: ...rve the applicable country specific legal regulations with regard to the disposal of products or waste occurring in the various phases of the life cycle The corresponding disposal standards are also t...

Reviews: