EN
11
www.eberg.eu
ETS 200
1. Prepare 8 mm drill bit.
2. Before drilling holes, mark their positions on the
wall. Drill the holes with a drill.
3. Install the accessories to the wall in sequence
as shown.
4. Install the wall bracket onto the towel rack.
5. Connect the towel rack to the wall pendant.