SVS/12
994.530 G01 02
75
3.4 Cable connection on 1250 A panels
The safety regulations must be observed when connecting cables (see chapter 1.3).
Different cable connections are available with SVS/12 switchgear. The following is an overview of connections on 1250 A
panels. See chapter 3.3 for connections on 630 A panels.
Panel equipped with:
Terminal blocks with locked
cable access ports for
“Eaton flags
"
Dry end seal for synthetic
cables max. 630 mm
2
Cu or Al
1 cable per phase
2 cables per phase
Panel equipped with:
cones according to
EN50181:
type C and D
Cable socket connections
Plug connections
CABLE PANELS
Plug connection with
T-plugs with screw
connection for synthetic
cables
Type C:
maximum630 mm
2
Cu
or Al
Type D:
Maximum 630 mm
2
Cu or Al
See chapter 3.3.1
1 cable per phase
2 cables per phase
Summary of Contents for SVS/12
Page 133: ...SVS 12 994 530 G01 02 133 9 2 Voltage detecting system Wega 1 2...
Page 134: ...SVS 12 134 994 530 G01 02...
Page 135: ...SVS 12 994 530 G01 02 135...
Page 136: ...SVS 12 136 994 530 G01 02...
Page 137: ...SVS 12 994 530 G01 02 137 9 3 Phase monitor Orion 3 0...
Page 138: ...SVS 12 138 994 530 G01 02...