Installation
Copyright © 2008 Eaton Corporation. All Rights Reserved.
IPN 997-00012-56C September 2008
23
Step 5 - Connect the cables at the equipment to be powered
Follow the instructions provided by the equipment supplier/manufacturer.
Step 6 - Replace dc terminal cover
Procedure complete
Task 5 - Install the Batteries Modules (if required)
Ignore this task if no battery modules will be connected.
I
Batteries
•
Batteries can present a risk of electric shock or burns from high short-circuit current.
•
Do not alter any battery module cables or connectors.
•
Do not place any metal objects in or near the connectors.
•
VRLA lead acid batteries can emit explosive gases and must be installed with adequate
ventilation. Do not install batteries in a sealed room or cabinet.
•
Do not attempt to disassemble battery modules. Return them (in their original packaging) with a
completed Equipment Incident Report on page
.
•
Only dispose of battery modules according to Battery Disposal and Recycling on page
•
Check the battery recharge dates on the shipping carton labels. Do not use the batteries if the
date has expired and the batteries were never recharged. Contact your battery supplier.
•
Batteries are heavy. Two people may be required to lift a module.
•
Batteries must be installed at the bottom of the rack.
Step 1 - Fit rack rails or battery shelves (if required)
The weight of the battery modules must be fully supported by either fixed
side rails or battery shelves.
If not already fitted, fit fixed rails or shelves (starting at the bottom of the
rack) to suit the number of battery modules.
Refer to Spare Parts on page
for available fixed rails.