
4 Operation
4.2 Operational warnings
116
Rapid Link 5 · RAMO5 · RASP5
05/20 MN034004EN
www.eaton.com
4.2 Operational warnings
Please observe the following notes.
DANGER
Commissioning must only be completed by qualified technicians.
DANGER – DANGEROUS ELECTRICAL VOLTAGE!
The safety instructions on pages I and II must be followed.
ATTENTION
Before switching on the supply voltage (400 V AC) for the first
time, check that all cables are connected to the correct termi-
nals and that all PE and earth connections have been establis-
hed.
ATTENTION
For RASP5 units, the pause between two power-on operations
must be at least one minute.
DANGER
The contacts of the motor feeder sockets may be live when the
supply voltage (mains voltage) is connected.
The control signal terminals are isolated from the line power
potential.
DANGER
RAMO5 unit outputs carry a dangerous voltage whenever the
supply voltage is switched on, even if the unit is in the OFF/
STOP state.
DANGER
Do not remove the motor plug or power plug when the system
is live.
DANGER
The output to the brake carries a dangerous voltage whenever
the supply voltage is switched on - even if in the OFF state!