1 Device series DC1-S…
1.12 Charging the internal DC link capacitors
DC1-S…20…, DC1-S…OE1 Variable Frequency Drives
05/21 MN040058EN
www.eaton.com
25
1.12 Charging the internal DC link capacitors
After extended storage times or extended downtimes during which no
power is supplied (> 12 months), the capacitors in the internal DC link must
be recharged in a controlled manner in order to prevent damage. To do this,
the DC1-S… variable frequency drive must be supplied with power, with a
controlled DC power supply unit, via the mains connection terminals (e.g.,
L1/L und L2/N).
In order to prevent the capacitors from having excessively high leakage
currents, the inrush current should be limited to approximately 300 to
800 mA (depending on the relevant rating). The variable frequency drive
must not be enabled during this time (i.e. no start signal). After this, the
DC voltage must be set to the magnitudes for the corresponding DC link
voltage (U
DC
∼
1.41 x U
e
) and applied for one hour at least (regeneration
time).
•
DC1-S1…: about 162 V DC at U
e
= 115 V AC
•
DC1-S2…: about 324 V DC at U
e
= 230 V AC
1.13 Service and warranty
In the unlikely event that you have a problem with your DC1-S… variable
frequency drive, please contact your local sales office.
When you call, have the following data ready:
•
The exact variable frequency drive part number (see nameplate),
•
the date of purchase
•
a detailed description of the problem which has occurred with the
variable frequency drive.
If some of the information printed on the rating plate is not legible, please
state only the data which are clearly legible.
Information concerning the guarantee can be found in the Terms and
Conditions Eaton Industries GmbH.
Break-Down Service
Please contact your local office:
http://www.eaton.eu/aftersales
or
Hotline After Sales Service
+49 (0) 180 5 223822 (de, en)
Summary of Contents for PowerXL
Page 4: ......