MBM INSTALLATION
Eaton 9395 Maintenance Bypass Module Installation and Operation Manual
S
164201719 Rev 3
www.eaton.com/powerquality
4-12
Ground Terminals
AC Output to
Critical Load
AC Input from
UPS to MIS
Phase A (MIS-1)
Phase C (MIS-5)
Phase B (MIS-3)
`
(E12)
Neutral Terminals
Phase A (E1)
Phase C (E3)
Phase B (E2)
AC Input to
Maintenance Bypass
Phase A (E13)
Phase C
(E15)
Phase B
(E14)
AC Output
from Optional
BIB to UPS
Phase A (BIB-1)
Phase C (BIB-5)
Phase B (BIB-3)
Phase A (RIB-1)
Phase C (RIB-5)
Phase B (RIB-3)
AC Output
from Optional
RIB to UPS
Figure 4‐10. 9395 275 kVA MBM Power Terminal Detail – Right Side View