Powerware 9170
+
Rail Kit
9- and 12-Slot CabinetsInstallation Guide
®
Page 1: ...Powerware 9170 Rail Kit 9 and 12 Slot Cabinets Installation Guide...
Page 2: ...Quality Corporation Torx is a registered trademark of Textron Inc ECopyright 2002 2006 Eaton Corporation Raleigh NC USA All rights reserved No part of this document may be reproduced in any way withou...
Page 3: ...NOTE The 9 and 12 slot cabinets are heavy 9 slot 72 kg 158 lb 12 slot 89 kg 196 lb This procedure requires two people to lift and position the cabinet into the equipment rack Install the cabinet in th...
Page 4: ...com 2 4 Install six metal clip nuts nine clip nuts for 12 slot cabinets onto each side flange along the front of the cabinet see Figure 1 NOTE DO NOT install metal clip nuts in the bottom cabinet sect...
Page 5: ...o offset tabs on the rear edge of the ear into the matching tab slots on the cabinet side frame see Figure 1 Pivot the ear forward until it is flush against the cabinet side frame Secure each ear with...
Page 6: ...nt rail on each side of the rack using four 10 32 1 2 flat head screws per rail 8 With one person lifting each side of the cabinet position the cabinet onto the two equipment rails see Figure 3 Carefu...
Page 7: ...local service representative Please have the following information ready when you call the Help Desk S Model number S Serial number S Version number if available S Date of failure or problem S Symptom...
Page 8: ...164201420B 164201420 B...