Installation
4-20
Eaton
®
Power Xpert
®
9395C UPS Installation and Operation Manual
P-164000821—Rev 01
www.eaton.com/powerquality
Figure 4-15. ISBM Section Power Terminal Locations
DC Input from B (E4)
For 4-wire systems only
DC Input from Battery - (E5)
AC Input to UPS Bypass
(A, B, C)
(See Figure 4
‐
18 for Detail AA.)
(See Figure 4
‐
19 or
Figure 4
‐
20 for Detail BB.)
(See Figure 4
‐
19 or Figure 4
‐
20
for Detail BB.)
AC Output
to
Critical Load
Phase B (E10)
ISBM
A
A
B
B
E9/E10/E11
AC OUTPUT
TO LOAD
Phase C (E11)
Phase A (E9)
Summary of Contents for Power Xpert Series
Page 2: ......
Page 23: ...Section I Installation...
Page 24: ......
Page 93: ...Section II Operation...
Page 94: ......
Page 155: ......
Page 156: ...P 164000821 1 P 164000821 1...