4.1
Preliminary Installation Information
WARNING
Installation should be performed only by qualified personnel.
AVERTISSEMENT!
L’installation ne doit être effectuée que par du personnel qualifié.
Refer to the following while installing the UPS system:
l
Chapter 3 for cabinet dimensions, equipment weight, wiring and terminal data, and installation notes.
l
Do not tilt the cabinets more than 10° during installation.
l
Remove the conduit landing plates to add conduit landing holes as required. Plate material is 16 gauge steel
(1.5 mm/0.06” thick).
l
If perforated floor tiles are required for ventilation, place them in front of the UPS.
4.2
Unloading the UPS Sections from the Pallet
The ISBM and PM sections are bolted to separate wooden pallets supported by wood skids. To remove the
pallets:
WARNING
The ISBM with PM section is heavy (see Table 3-1). If unpacking and unloading instructions are not
closely followed, the cabinets may tip and cause serious injury.
AVERTISSEMENT!
Les sections de l’onduleur sont lourdes (voir le tableau 3-1). Suivre attentivement les instructions
de déchargement et de déballage pour éviter de renverser les armoires, ce qui pourrait causer de
graves blessures.
CAUTION
l
Do not tilt cabinets more than 10° from vertical.
l
Lift the cabinets only with a forklift or damage may occur.
Summary of Contents for Power Xpert Series
Page 2: ......
Page 23: ...Section I Installation...
Page 24: ......
Page 93: ...Section II Operation...
Page 94: ......
Page 155: ......
Page 156: ...P 164000821 1 P 164000821 1...