UPS INSTALLATION PLAN AND UNPACKING
Eaton
Power Xpert 9395P UPS (300 kVA, 300 kW) Installation and Operation Manual
S
P-164000563 Rev 1
www.eaton.com/powerquality
3-18
4.
Remove the protective covering from the cabinets.
5.
Remove the packing material, and discard or recycle in a responsible manner.
6.
Inspect the contents for any evidence of physical damage, and compare each
item with the Bill of Lading. If damage has occurred or shortages are evident,
contact an Eaton service representative immediately to determine the extent of
the damage and its impact on further installation.
NOTE
While waiting for installation, protect the unpacked cabinets from moisture, dust, and other harmful
contaminants. Failure to store and protect the UPS properly may void your warranty.
Figure 3‐4. Single UPM Configuration as Shipped on Pallet (ISBM and UPM)