Figure 27. J39 Location on Pl1 Interface Board
Pl1 Interface Board
J39 Inverter CAN Connector
44..55
FFiieelldd IInnssttaalllleedd U
UP
PM
M IInnssttaallllaattiioonn
If installing a Plus 1 configuration with an FI-UPM, install the FI-UPM using the instructions in the
Eaton
®
Power
Xpert
®
9395P UPS Field Installed UPM Mechanical Installation Manual
(P-164000503) listed in paragraph
for more info. After the FI-UPM is installed, proceed to paragraph
in this document if installing a battery system; otherwise, proceed to paragraph
Distributed Bypass Tie Cabinet Installation
in this document to complete the wiring of the UPS.
44..66
B
Baatttteerryy S
Syysstteem
m IInnssttaallllaattiioonn
If installing a battery system, install the customer-supplied battery system according to the battery and battery
system manufacturer's instructions and all applicable codes and regulations, including the NEC, Article 480.
After the battery system is installed, proceed to paragraph
Distributed Bypass Tie Cabinet Installation
if
installing a distributed bypass tie cabinet; otherwise, proceed to paragraph 4-8
Installing UPS External and Battery Power Wiring
to complete the wiring of the UPS.
44..77
D
Diissttrriibbuutteedd B
Byyppaassss TTiiee C
Caabbiinneett IInnssttaallllaattiioonn
NOTE
The tie cabinet must contain Module Output Breakers (MOBs) with dual auxiliary
contacts for control of the system. Without dual auxiliary MOBs, UPMs are not allowed
to go to bypass individually during servicing. All UPMs will go to bypass instead of the
just the UPM needing service, decreasing critical load protection. With dual auxiliary
MOBs, one UPM can be bypassed while the remaining UPMs support the load as long
as the remaining UPMs have the capacity to do so.
If installing a distributed bypass system, install the customer-supplied tie cabinet or distribution panel according
to the tie cabinet or distribution panel manufacturer's instructions and all applicable codes and regulations,
including the NEC, Article 480. After the tie cabinet is installed, proceed to paragraph 4.8 to complete the
wiring of the UPS.
44..88
IInnssttaalllliinngg U
UP
PS
S EExxtteerrnnaall aanndd B
Baatttteerryy P
Poow
weerr W
Wiirriinngg
NOTE
The ISBM and UPM sections are shipped with debris shields covering the ventilation
grills on top of the sections (see
). Do not remove the debris shields until
installation is complete. However, remove the shields before operating the UPS. Once
the debris shields are removed, do not place objects on the ventilation grills.