7.
Install wiring between the UPS and SCM II. See
and
for the Hot Sync CAN Bridge Card
terminal location and wiring information, and
, and
for the SCM II terminal
location and wiring information.
NOTE
120 Vac for the SCM II should be supplied from the critical bus by facility planners or the
customer.
8.
Install 120 Vac power wiring from the critical bus to the SCM II. See
,
, and
for
the terminal location and wiring information.
Figure 56. Supervisory Contact Module II Terminal Location.
Ground
Terminal
Terminal TB1 Signal
Connections from the UPS
Terminal TB3
120 Vac Power
Terminal TB2 Customer
Supervisory Contact Interface
NOTE
Setup of the Hot Sync CAN Bridge Card must be performed by an authorized Eaton
Customer Service Engineer. Contact an Eaton service representative to schedule a date.
9.
Install wiring between the SCM II terminal block TB2 and the monitoring equipment. See
for
terminal block location and
for terminal assignments.
10. Close the front door and secure the latch.
11. Restart the UPS. See
for startup instructions.