
58
Eaton
®
Power Xpert
®
9395P-1200 Installation and Operation Manual 164000500—Rev 11
ATTENTION!
Lors de l’installation, prendre soin de protéger les composantes du côté droit du module de contournement de
système intégré (ISBM) et les faisceaux de câbles reliant les armoires du côté gauche du module
d’alimentation universel (UPM).
NOTE
Clearance between the ISBM and the UPM sections must be less than 1/2" so that
joining brackets can be installed.
7.
Using a forklift with the forks in the front forklift slots, position the ISBM section adjacent to the left side of
the previously installed UPM section. Verify that the ISBM section right side is against the UPM section
left side and the front of the cabinet bases are flush with each other (see
).
8.
Reinstall the corner channel (see
) and secure using the retained hardware.
9.
Reinstall the left middle panel (see
) and secure using the retained hardware.
Figure 22. ISBM and UPM Sections Joined (Three UPM Section Shown)
UPM Wireway
(Power wiring harnesses are coiled in this area.)
For 4-wire
systems only
10. Reinstall the left top panel (see
) and secure using the retained hardware.
NOTE
Three flat cabinet joining brackets are provided in the hardware kit for securing the ISBM
and UPM sections at the top front, top rear, and front base (see Steps 11 and 12).
11. Locate the hardware kit (packed inside a drawstring bag tied to the left middle panel of the UPM section).
Locate two flat brackets and screws from the hardware kit. Align the holes in the flat brackets over holes in
Summary of Contents for Power Xpert 9395P-1100/1100
Page 8: ......
Page 214: ...16400050011 164000500 11...