106
Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201725—Rev 15
Figure 64. Remote Monitor Panel II, Relay Interface Module II, or Supervisory Contact Module II Wiring
UPS Can Card J3
120 Vac from
Critical Bus
Line
Neutral
Twisted Pair
Ground Terminal
RMP II, RIM II, or SCM II
Table 29. RMP II, RIM II, or SCM II Wiring Terminations
From
UPS CAN Card
To
RMP II, RIM II, or SCM II
Tightening Torque
Nm (lb in)
Remarks
J3–6 (
TX
)
TB1–5 (RDX*)
0.9 (8)
Use twisted pair
J3–7 (TX)
TB1–4 (RDX)
0.9 (8)
N/A
TB3 Line
0.9 (8)
N/A
TB3 Neutral
0.9 (8)
N/A
Ground Terminal
2.7 (24) Maximum
NOTE
Setup of the Powerware Hot Sync CAN Bridge Card must be performed by an
authorized Eaton Customer Service Engineer. Contact an Eaton service representative
to schedule a date.
11. To check the operation of the RMP II, ensure that the UPS is supplying the load via inverter or bypass. If
the indicators on the RMP II show the appropriate status, then it is operating correctly.
If the communication link between the UPS and the RMP II is not present, the RMP II performs a self–test
(all indicators flash and the horn beeps at one–second intervals). If the self-test occurs, check all harness
connectors and the fuse for proper seating. If all connections are secure but the RMP II continues to self–
test, replace the fuse with the spare included in the hardware kit. If a fuse replacement does not correct
the problem, contact an Eaton service representative for verification that the RMP II is working correctly.
12. To test the indicator lamps, press and hold the horn silence pushbutton for three seconds. All lamps should
illuminate, and the horn sounds continuously until you release the pushbutton.