UPS Installation Plan and Unpacking
3-14
Power Xpert
TM
9395 550/275 UPS (225–550 kVA) Installation and Operation Manual
164201716—Rev 8
www.eaton.com/powerquality
Table 3-10. UPS Cabinet Power Cable Terminations for the Power Xpert 9395-550/275
Terminal Function
Terminal
Function
Bus Landings
Tightening Torque
Nm (lb ft)
Bolt Size
AC Input to UPS Rectifier
E1
Phase A
4 – 2 bolt mounting
76 (56)
M12
E2
Phase B
4 – 2 bolt mounting
76 (56)
M12
E3
Phase C
4 – 2 bolt mounting
76 (56)
M12
AC Input to Bypass
E6
Phase A
4 – 2 bolt mounting
76 (56)
M12
E7
Phase B
4 – 2 bolt mounting
76 (56)
M12
E8
Phase C
4 – 2 bolt mounting
76 (56)
M12
AC Output to Critical Load
E9
Phase A
4 – 2 bolt mounting
76 (56)
M12
E10
Phase B
4 – 2 bolt mounting
76 (56)
M12
E11
Phase C
4 – 2 bolt mounting
76 (56)
M12
DC Input from Battery or Battery
Disconnect to UPS – Common
Battery
E4
Battery (+)
4– 2 bolt mounting
8 – 2 bolt mounting (with FI-UPM)
76 (56)
M12
E5
Battery (-)
4– 2 bolt mounting
8 – 2 bolt mounting (with FI-UPM)
76 (56)
M12
DC Input from Battery or Battery
Disconnect to UPS – Separate
Battery (UPM 1)
E4
Battery (+)
2 – 2 bolt mounting
76 (56)
M12
E5
Battery (-)
2 – 2 bolt mounting
76 (56)
M12
DC Input from Battery or Battery
Disconnect to UPS – Separate
Battery (UPM 4 FI-UPM)
E4
Battery (+)
2 – 2 bolt mounting
76 (56)
M12
E5
Battery (-)
2 – 2 bolt mounting
76 (56)
M12
Input and Output Neutral
E12
Neutral
8 – 2 bolt mounting
22 (16)
M10
Customer Ground
Ground
Ground
7 – 1 bolt mounting
22 (16)
M10
Summary of Contents for Power Xpert 9395 550/275
Page 1: ...Power Xpert 9395 UPS 550 275 UPS 225 550 kVA Installation and Operation Manual...
Page 2: ......
Page 3: ...Power Xpert 9395 UPS 550 275 UPS 225 550 kVA Installation and Operation Manual...
Page 27: ...Section 1 Installation...
Page 28: ......
Page 207: ......
Page 208: ...164201716 8 164201716 8...