
Powering down/up applications (examples)
Servicing the Network Management Module – 174
Non-priority equipment immediately shuts down when on battery for 10s to keep battery power for critical equipment.
4.3.3 Restart sequentially the IT equipment on utility recovery
4.3.3.1 Target
Restart the storage first (right after utility recovery), database servers next (2min after utility recovery) and applications last (3min
after utility recovery).
4.3.3.2 Step 1: Installation setup
4.3.3.2.1 Objective
Use load segmentation provided by the UPS to independently control the power supply of each IT equipment categories
(Applications, Database servers, Storage).
Summary of Contents for INDGW-X2
Page 1: ...UPS Industrial Gateway Card INDGW X2 User s Guide English 10 18 2021 2 2 3 ...
Page 23: ...Configuring Modbus Installing the Network Management Module 25 ...
Page 24: ...Configuring Modbus Installing the Network Management Module 26 ...
Page 25: ...Configuring Modbus Installing the Network Management Module 27 ...
Page 26: ...Configuring Modbus Installing the Network Management Module 28 ...
Page 35: ...Home Contextual help of the web interface 37 3 2 7 1 3 Battery mode 3 2 7 1 4 Off mode ...
Page 37: ...Home Contextual help of the web interface 39 3 2 7 2 2 Bypass mode 3 2 7 2 3 Battery mode ...
Page 61: ...Protection Contextual help of the web interface 63 Example 4 Custom ...
Page 62: ...Protection Contextual help of the web interface 64 Settings 1 Settings 2 ...
Page 218: ...Default settings and possible parameters Information 220 ...
Page 266: ...Acronyms and abbreviations Information 268 ...
Page 273: ......