![Eaton i-onEX Series Administrator'S And User Manual Download Page 71](http://html1.mh-extra.com/html/eaton/i-onex-series/i-onex-series_administrators-and-user-manual_3865630071.webp)
i-on40 & i-onEX Range
4. Administration
Page 65
presses is the same for all i-on
control units.
8.
Press
or
to display the output
you wish to test.
a). Press
.
The keypad gives a double “beep”
confirmation tone. The keypad
display shows:
The control unit turns on the output.
Check that that it is working as
expected.
Note: Outputs connected to radio output
modules may take several
seconds to change state.
b)
Press
again to turn the output
off.
The keypad gives a double “beep”
confirmation tone. The keypad
display shows:
9.
Press
to end the test.
NOTE: Make sure no one tries to activate an output by means of a remote
control while you perform the test.
When you complete the test check that the output is back in the
state it had before testing. For example, if the output was off before
testing, make sure it is off after testing.
Remotes and Two-way Keyfobs
1.
Make sure the display shows the
standby screen.
2.
Press .