
Data-Voice-Video 3G Power Solutions (UL-Listed Models)
10
Copyright © 2011 Eaton Corporation. All Rights Reserved.
IPN 997-00012-82B May 2011
Warnings
This section contains important warnings. Read these warnings before installing or operating
Data-Voice-Video 3G Power Solutions dc power systems.
Electrical Safety
The cabinet of the Data-Voice-Video 3G Power Solutions (UL-Listed Models) dc power system is a fire
enclosure as specified in UL 60950-1.
All power sources must be isolated before internally servicing the equipment.
The dc power system must be connected to a suitable and readily accessible disconnect device(s).
The dc power system is not compatible with IT (Impedance Terra) ac supply. For advice see Worldwide
Support on page
A registered electrician (or suitably qualified person) must check the integrity of the installed cabling,
BEFORE the dc power system is powered up.
Tasks must be performed in the sequence documented in this guide.
Location and Environment
The DV2-3G must be installed in a Restricted Access Location (dedicated equipment rooms, equipment
closets, or similar) in accordance with the U.S. National Electric Code (NEC), ANSI/NFPA No. 70, and
according to the applicable local codes.
For ease of access and to maintain optimum system cooling, observe the clearances stated on page
Ensure the ambient temperature and humidity are within the ranges in the Specifications on page
Dust build-up within the DV2-3G may cause premature failure. In dusty environments filter the
ventilation air entering the equipment room. Ensure regular cleaning of the air filters.
Do not allow water or any foreign object to enter the DV2-3G. Do not place objects containing liquid on
top of or near the unit.
Reverse Polarity
Always check that the battery cables have been terminated to the correct system polarity BEFORE
connecting the batteries or closing the battery disconnect device. Connecting batteries to the dc power
system with incorrect system polarity will damage the rectifiers and void all warranty claims.
Hazardous Energy Levels
Rectifiers and batteries contain hazardous energy levels. Only personnel trained and experienced in dc
power systems are to service/maintain this equipment.
Always use insulated tools.
Do not short-circuit the live and common bus bars or cables.
Maximum Load Currents
Do not exceed the maximum load currents stated in the Specifications on page
Battery Current
The short circuit current capability of the battery circuit connected to the battery input terminals must not
exceed 5,000A.