1 Device series DS7
1.9 Maintenance and inspection
DS7 Soft starter
09/16 MN03901001Z-EN
www.eaton.com
23
If installed in machines, the soft starters must not be commissioned until it
has been determined that the corresponding machines comply with the
safety requirements in Machinery Directive 2006/42/EC. Standard EN 60204
must be complied with within this context. Commissioning is only permitted
if the requirements of the EMC Directive (2014/30/EU) have been observed.
The soft starters of the DS7 series meet the requirements of the Low
Voltage Directive 2014/35/EU and the product standard EN 60947-4-2.
The user is responsible for ensuring that the use of the relevant machines,
as well as the corresponding applications, complies with all applicable EC
Directives. Any other usage constitutes improper use.
Observe the technical data and connection requirements. These are shown
on the rating plate of the soft starter as well as in this documentation.
1.9 Maintenance and inspection
DS7 soft starters will be maintenance-free provided that the corresponding
general rated operational data, as well as all specific technical data
(
section 1.7, “Technical data”) for the relevant versions, is observed.
However, please note that external factors may have an impact on the
operation and lifespan of DS7 soft starters.
We therefore recommend that the devices are checked regularly and the
following maintenance measures are carried out at the specified intervals.
Table 8: Maintenance measures and maintenance intervals
DS7 soft starters are not designed in such a way as to allow for the
replacement or repair of their individual components or sub-assemblies.
→
At the output of a DS7 soft starter (terminals U, V, W) you must
not
•
connect any capacitive load (e.g. phase compensation
capacitors),
•
do not connect any further soft starters (parallel connection
on output side).
Maintenance measures
Maintenance interval
Clean cooling vents (cooling slits)
please enquire
Check the fan function
6 - 24 months (depending on the environment)
Filter in the control panel doors
(see the manufacturer’s specifications)
6 - 24 months (depending on the environment)
Check the terminal’s (control signal terminals,
power terminals) tightening torques
regularly
Check connection terminals and all metallic surfaces for
corrosion
6 - 24 months; when stored, no more than 12 months later
(depending on the environment)
Motor cable
According to manufacturer specifications, no later than 5 years
Summary of Contents for DS7 Series
Page 1: ...Manual DS7 Soft starter 09 16 MN03901001Z EN...
Page 4: ...II...
Page 36: ...1 Device series DS7 1 14 Function 32 DS7 Soft starter 09 16 MN03901001Z EN www eaton com...
Page 96: ...3 Installation 3 6 Insulation test 92 DS7 Soft starter 09 16 MN03901001Z EN www eaton com...
Page 188: ...8 SmartWire DT 8 9 Programming 184 DS7 Soft starter 09 16 MN03901001Z EN www eaton com...