Step 4 - Check the rectifier currents
1
Check the rectifier currents.
2
Verify the load current is as expected for the load and battery size.
Step 5 - Charge the batteries
1
Charge the batteries according to the battery manufacturer’s recommendations.
2
If an
Equalize
charge is recommended by the battery manufacturer then follow
the instructions in the System Controller Operation Handbook.
Equalize increases the system voltage to the Equalize voltage for the Equalize
duration. After the Equalize duration has expired, the dc power system voltage
reverts to float voltage automatically.
Procedure complete
Start-Up Completed
Start-Up of the APS is now complete and the system is operational.
If a formal commissioning test is required then see the Commissioning check lists on page
The System Controller Operation Handbook (see Related Information on page
) describes how
to use the SC200 or SC100 system controller. See:
•
System Operation
to customize the system configuration settings, and
•
Communications
to setup the remote communications options.
For information on alarms, or operation problems see Maintenance on page