![Eaton AMPGARD NEMA 3R Instruction Booklet Download Page 8](http://html1.mh-extra.com/html/eaton/ampgard-nema-3r/ampgard-nema-3r_instruction-booklet_3709288008.webp)
8
Instruction Booklet
IB48091
Effective October 2022
Instructions for Eaton’s AMPGARD
®
NEMA 3R motor control center
EATON
www.eaton.com
1.9 Modifications to equipment
Any modifications to the equipment outside of the assembly instruc-
tions in Eaton documentation may compromises compliance with UL
standard . Please contact the factory with any related questions .
1.10 Documentation reference
Any modifications to the equipment outside of the assembly instruc-
tions in Eaton documentation may compromises compliance with UL
standard . Please contact the factory with any related questions .
IB48041:
AMPGARD
®
400A Motor Starters;
IB48043
: AMPGARD
®
800A Motor Starters; and
IB020003
: AMPGARD
®
RVSS Soft Starters .
For further information on installation and application, refer to the
applicable technical data, publications, and/or industry standards .
Download Eaton electronic information from
www .eaton .com/AMPGARD .
1.11 Eaton contact information
For the location of your nearest Eaton sales office or distributor, call
toll-free 1-800-525-2000 or log onto www .eaton .com/AMPGARD .
Eaton Services and Systems (EESS) can be reached at 1-800-498-
2678 .
m
CAUTION
THE OUTDOOR RATING OF THE EQUIPMENT IS ONLY VALID WHEN ALL THE
COVERS AND DOORS ARE PROPERLY SECURED OVER THE ENTIRE LENGTH
OF ANY GIVEN LINEUP.
WWHEN WORKING ON MEDIUM VOLTAGE EQUIPMENT, PERSONNEL
MUST WEAR APPROPRIATE PPE.
m
CAUTION
BEFORE ENERGIZING THE EQUIPMENT ENSURE THAT:
• THE EQUIPMENT IS SECURED ON A TRUE AND LEVEL SURFACE.
• CONFIRM THAT ALL THE HARDWARE IS IN PLACE AND TORQUED PER
SPECIFIED VALUES.
• CONFIRM NO TOOLS OR OBJECTS ARE LEFT INSIDE THE ENCLOSURE.
• CONFIRM ALL COVERS, DEVICES, DOORS, PANELS ETC. ARE SECURED.
Figure 9. Location of lifting angles.
Section 2: Receiving, handling, and storing
2.1 Receiving
The equipment is shipped assembled in shipping sections/splits .
Depending on the length of the lineup, it may be necessary to
ship the equipment in several shipping sections/splits to facilitate
handling . Each shipping section/split is shipped bolted to a wooden
skid and covered with protective material .
A box(s) labeled “Installation Parts or Ship Loose Parts” is also
included . This box contains the packing list . The packing list identi-
fies all cartons and skids . Each carton and skid are labeled with the
shop order number and a shipping weight . Only accept items from
the shipping carrier if all the items described on the packing list have
been received . If the equipment has been damaged, file a claim
as soon as possible with the carrier and notify the nearest Eaton
representative .
2.2 Handling
The unit is equipped with insulated components for medium voltage
and must be protected against damage during handling . The control-
ler should always remain upright . Exercise extreme care during
any movement and placement operations to prevent dropping or
unintentional rolling or tipping . The preferred method of lifting and
maneuvering the shipping sections/splits into their final position is
with an overhead crane . Lifting angle of appropriate length is bolted
to the top of each shipping section . Lifting clip assemblies are used
to bolt the angle to the roof of enclosure units . Attach a 2-leg sling
with hooks to the lifting angle to lift or move the sections . Do not
allow the angle between the lifting cables and vertical to exceed 45
degrees . If a crane is not available, shipping sections/splits/skids
can be moved by use of rollers . However, safeguards need to be
put in place to assure that the equipment is not deformed during
maneuvering .
Each controller is properly adjusted at the factory before shipment .
However, vibration and mechanical stresses imposed by transit and
installation can adversely affect mechanical interlocks . Therefore, a
final inspection is essential before energizing .
ote:
N
The assembly will tilt at a slight angle due to the variation in the center
of gravity .