Eaton 93PM Universal Integrated Battery Cabinet (IBC-LW and IBC-LHW) Installation Manual P-164000541—Rev 04
29
C
Chhaapptteerr 44 IInnssttaallllaattiioonn
44..11
P
Prreelliim
miinnaarryy IInnssttaallllaattiioonn IInnffoorrm
maattiioonn
WARNING
Installation should be performed only by qualified personnel knowledgeable of batteries and the required
precautions.
Observe these precautions while installing the Universal Integrated Battery Cabinet (IBC):
•
Remove watches, rings, or other metal objects.
•
Use tools with insulated handles.
•
Wear voltage rated gloves and electrical hazard footwear.
•
Do not lay tools or metal parts on top of batteries or battery cabinets.
•
Review
Chapter 3
Installation Plan and Unpacking
for cabinet dimensions, equipment weight, wiring
and terminal data, and installation notes.
44..22
U
Unnllooaaddiinngg tthhee IIB
BC
C C
Caabbiinneett ffrroom
m tthhee P
Paalllleett
WARNING
•
The IBC is heavy (see
, and
). If unpacking and unloading instructions are
not closely followed, the cabinet may tip and cause serious injury.
•
RISK OF INSTABILITY. Do not remove any internal panels until the cabinet is removed from and lowered
from the pallet.
•
Do not tilt cabinet more than 10° from vertical.
•
Lift the cabinets only with a forklift or pallet jack or damage may occur.
•
Ensure forklift is rated to handle the weight of the cabinet.
Failure to follow these instructions may result in severe injury or death.
NOTE
For the following procedures, verify that the forklift or pallet jack is rated to handle the
weight of the cabinet (see
,
, and
for cabinet weight).
The IBC is bolted to a pallet consisting of two metal angle supports and two flat supports secured to two wood
supports.
To remove the pallet:
CAUTION
Do not use the jacking bolts on a soft surface floor. Use only on a hard surface, such as concrete. If necessary
remove pallet on a hard surface and roll cabinet to final installation position.
1.
If not already accomplished, use a forklift or pallet jack to move the IBC to the installation area, or as close
as possible, before unloading from the pallet. Insert the forklift or pallet jack forks between the supports on
the bottom of the pallet (see
for the IBC cabinet center of gravity measurements).