53
Figure 23. 93PM 50 kW IAC-T or 93PM 100 kW IAC-T Power Terminal Locations – 3+0, 3+1, and 4+0 with
MIS and MBP
AC Input to MOB 2 from UPS 2
(A, B, C)
AC Input to MOB 1 from UPS 1
(A, B, C)
AC Output to Critical Load
(A, B, C)
AC Input to MOB 3 from UPS 3
(A, B, C)
AC Input to MOB 4 from UPS 4 -
Only installed on 3+1 and 4+0 models
(A, B, C)
AC Input to Maintenance
Bypass
(A, B, C)
Ground Terminals