Installation
4-26 Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev
7
www.eaton.com/powerquality
Figure 4-19. 93PM 200 kW Three-Wire SIAC-B and 93PM 200 kW Four-Wire SIAC-B Left-Mounted Bypass Power Input,
Power Output, and Ground Terminal Locations
AC Input to UPS Rectifier
(Source 1) (A, B, C)
(See Figure 4-21 for detail.)
Front
Ground Terminals
AC Output to
Critical Load
AC Input to
Maintenance
Bypass (Source 2)
Phase A (E6)
Phase B (E7)
Phase C (E8)
Phase A (E9)
Phase B (E10)
Phase C (E11)
Output Neutral (E12)
(Four-Wire Model Only)
Bypass Neutral (E12)
(Four-Wire Model Only)
Summary of Contents for 93PM 150 kW SIAC-B Three-Wire