
Installation
4-22 Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev
7
www.eaton.com/powerquality
Figure 4-15. 93PM 150 kW Three-Wire SIAC-B and 93PM 150 kW Four-Wire SIAC-B Conduit Landing Wire Entry Locations
Top Entry Conduit Landing.
(Remove plate to drill or
punch conduit holes.)
Bottom Entry Conduit Landing.
(Remove plate to drill or punch
conduit holes.)
UPS with Left-Mounted SIAC-B
UPS with Right-Mounted SIAC-B
Front
Front
Top
View
UPS with Left-Mounted SIAC-B
UPS with Right-Mounted SIAC-B
Front
Front
Bottom
View
Summary of Contents for 93PM 150 kW SIAC-B Three-Wire
Page 2: ......
Page 19: ...Section 1 Installation ...
Page 20: ......
Page 75: ...Section 2 Operation ...
Page 76: ......
Page 105: ......
Page 106: ... P 164000387 7 P 164000387 7 ...