Eastsign
R
O
TAR
Y
HE
AT
PRE
SS
R
OT
-M
U
SER
MA
NU
A
L
11
5. Installation
The machine must be placed on flat floor in the workplace where is bigger than double length and double
width of the machine at least. The room was required being dry and ventilated.
5.1 Disassembling of crate
5.1.1.
Unscrew the bolts on all edges and nails on the top of the machine
5.1.2.
Use hammer and crowbar to take out the upper cover plate
5.1.3.
Take out the wooden plates on four sides
5.1.4.
Use forklift moving heat press to proper location
5.2 Installation of the machine
Install the working table refer to the stick number on
Use water pipe (more than 10m long) to level of machine
Connect
compressed air blow gun
(for air expanding shafts) to outlet on lower left rear side of machine
Summary of Contents for ROT Series
Page 1: ...User Manual Eastsign ROTM20210607 Eastsign Rotary Heat Press ROT M User Manual ...
Page 8: ...Eastsign ROTARY HEAT PRESS ROT M USER MANUAL 6 3 2 Nameplate ...
Page 9: ...Eastsign ROTARY HEAT PRESS ROT M USER MANUAL 7 4 Introduction 4 1 List of Parts Front view ...
Page 18: ...Eastsign ROTARY HEAT PRESS ROT M USER MANUAL 16 8 Electrical Schematic ...
Page 20: ...Eastsign ROTARY HEAT PRESS ROT M USER MANUAL 18 10 General Maintenance ...