Eastron SDM630-TCP User Manual Download Page 1

SDM630-TCP User Manual 2021 V1.0

2021 EASTRON ELECTRONIC.

ALL RIGHTS RESERVED.

www.eastrongroup.com

Three Phase Multifunctional Energy Meter

SDM630-TCP

User manual V1.0

Summary of Contents for SDM630-TCP

Page 1: ...SDM630 TCP User Manual 2021 V1 0 2021 EASTRON ELECTRONIC ALL RIGHTS RESERVED www eastrongroup com Three Phase Multifunctional Energy Meter SDM630 TCP User manual V1 0...

Page 2: ...f the company no paragraphs or chapters in this manual can be extracted copied or reproduced in any form Otherwise the violator shall bear all consequences The company reserves all legal rights The co...

Page 3: ...3 2 6 Wiring diagram 3 Chapter 3 Operation 4 3 1 Installation display 4 3 2 Button Function 4 3 3 Measurements 5 3 3 1 Voltage and current 5 3 3 2 Frequency Power factor and Demand 5 3 3 3 Power 6 3...

Page 4: ...ta and uses 4 touch keypads in front for data checking and programming 1 2 Product Characteristics 100A direct load Multi parameters measurement Plug in solution LCD with white backlit adjustable back...

Page 5: ...ax for 0 01s Frequency Rated value 50 60Hz Range 45 65Hz Voltage withstand AC voltage withstand 4KV 1min Impulse voltage withstand 6kV 1 2 S waveform Power consumption 2W 10VA Display LCD with white b...

Page 6: ...rage humidity 95 Operating temperature 25 55 Storage temperature 40 70 International standard IEC62053 21 Accuracy class Class 1 Installation category CATIII Protection against penetration of dust and...

Page 7: ...left on here The interface performs a self test and indicates the result if the test passes 3 2 Button Functions Button Short click Long press 3s Display mode Setup mode Display mode Setup mode V1 V2...

Page 8: ...ts 3 3 1 Voltage and current Each successive pressing of the button selects a new range Phase to neutral voltage Phase to phase voltage Current on each phase Phase to neutral voltage THD Phase to neut...

Page 9: ...astrongroup com 6 Frequency and Power Factor total Power Factor of each phase Maximum current demand on each phase Maximum total power demand 3 3 3 Power Each successive pressing of the button select...

Page 10: ...L RIGHTS RESERVED www eastrongroup com 7 Instantaneous Volt amps in kVA Total kW kVArh kVA 3 3 4 Energy Each successive pressing of the button shows following measurements Total active energy in kWh T...

Page 11: ...password protected By long pressing the 4th button E the user can get into the setup mode 3 4 1 Password Validation Press button and to enter password Long press button for password confirmation If a...

Page 12: ...ange 001 247 default 001 3 4 3 Demand Interval Time setup Long press button to enter the setup Press button and to set the demand period value Long press button to confirm Option 0 5 8 10 15 20 30 60...

Page 13: ...ress button to confirm Option 3P4W default 3P3W 1P2W 1P3W 3 4 6 Password Modification Setup Long press button to enter the setup mode Press button and to enter the new password Long press button to co...

Page 14: ...ww eastrongroup com 11 Long press button to set IP address IP High 192 168 default IP Low 001 200 default 3 4 7 3 Subnet Mask address setup Long press button to enter the setup mode Subnet mask High 2...

Page 15: ...ter the setup mode of IP address of TCP gateway TCP gateway address High 192 168 default TCP gateway address Low 001 001 default 3 4 7 5 TCP IP Port setup Long press button to enter the setup mode of...

Page 16: ...l Selection interface Press button and to choose channel CH01 CH04 Long press to enter the reset confirmation interface Press button and to choose the data type Long press button to confirm Reset done...

Page 17: ...om 14 Chapter 4 Connection Diagram for Communication If you have any question please feel free to contact our sales team Zhejiang Eastron Electronic Co Ltd No 1369 Chengnan Rd Jiaxing Zhejiang 314001...

Reviews: