Energy Storage System - Three Phase
INVERTER
: ES-INV-TPH4K, ES-INV-TPH5K, ES-INV-TPH6K, ES-INV-TPH8K, ES-INV-TPH10K.
BATTERY
: ES-BAT-4.8S
USER MANUAL
Page 1: ...Energy Storage System Three Phase INVERTER ES INV TPH4K ES INV TPH5K ES INV TPH6K ES INV TPH8K ES INV TPH10K BATTERY ES BAT 4 8S USER MANUAL...
Page 2: ...trical Interface Introduction 3 3 2 Inverter Display Interface Introduction 3 3 2 1 Main Interface Of The Inverter LCD 3 3 2 2 Display Content Of Sub menu Status Item 3 3 2 3 Display Content Of Sub me...
Page 3: ...6 5 2 Electrical Connection Between Batteries 6 5 3 AUX LAN DRM RRCR Meter RS485 BMS Connection 35 36 37 33 5 5 1 Mounting The Battery 19 21 5 5 2 Mounting The Inverter 27 5 4 Preparing Tools And Ins...
Page 4: ...Product 47 47 09 42 MAINTENANCE AND TROUBLESHOOTING 9 1 Routine Maintenance 9 2 Troubleshooting 42 42 11 47 SPECIFICATION 11 1 Datasheet Of Inverter 11 2 Datasheet Of Battery 47 51 9 2 1 Inverter Erro...
Page 5: ...sioning con gura on opera on of the product as well as the opera on of the product user interface Read this document through understand the safety informa on and get familiar with the func ons and fea...
Page 6: ...used by such changes Any use of the product other than that described in the Intended Use sec on does not qualify as appropriate The enclosed documenta on is an integral part of this product Keep the...
Page 7: ...heated above 150 C When the ba ery pack is burning it leaks poisonous gases Do not approach WARNING Danger to life due to electric shock when live components or cables are touched DANGER 2 3 Importan...
Page 8: ...of high humidity If moisture has penetrated the ba ery pack e g due to a damaged housing do not install or operate the ba ery pack In case of contact with electrolyte rinse the a ected areas immediate...
Page 9: ...g The product complies with the requirements of the applicable EU direc ves Cer ed safety The product is TUV tested and complies with the requirements of the EU Equipment and Product Safety Act RCM Re...
Page 10: ...verter Electrical Interface Introduction Inverter Ba ery 1 2 Explain Name Object ES INV TPH4K ES INV TPH5K ES INV TPH6K ES INV TPH8K ES INV TPH10K ES INV TPH4K ES INV TPH5K ES INV TPH6K ES INV TPH8K E...
Page 11: ...r Status menu contains ve sub menus Solar Ba ery Grid UPS and Comm These display the relevant informa on about the current physical or communica on interface respec vely A Object Name Descrip on BAT L...
Page 12: ...I3 frequency F3 PInv PMeter AC PMeter DC Ba ery interface displays the real me informa on of ba ery side voltage U current I power P residual capacity of Ba ery SOC the internal environmental temperat...
Page 13: ...or total electricity quan ty ba ery charging from the PV panels Error Logs interface displays the 10 latest fault records of this device including the name of the fault and me of error Make sure all n...
Page 14: ...er without ba ery please set it Yes Step8 Click the Grid Func on to set up relevant parameters of the grid Step9 Set the Max Feed in rate value Step10 Click Func on System Mode to set system mode DC A...
Page 15: ...k Ethernet to set the IP address DHCP mode means that setup IP address is set up automa cally If you want to set up the IP address manually please choose manual mode Note It is needed to set the follo...
Page 16: ...T 4 8S 590 430 206 ES BAT 4 8S Connec on area overview of ES BAT 4 8S 7 1 4 5 6 2 3 Posi on Designa on BMS COM 1 Ba ery Posi ve Power Connector Grounding Ba ery Circuit Breaker BMS COM 2 with terminal...
Page 17: ...cable Indicates a signal cable Backup Critical Loads RCD Grid Normal Loads RCD Grid Meter 8 8 8 8 kW h Grid PV L1 L2 L3 N PE PV Inverter PV Meter 8 8 8 8 kW h Inverter Battery Pack Indicates a power...
Page 18: ...rator Storage System Scheme Indicates a power cable Indicates a signal cable O grid Storage System Indicates a power cable Indicates a signal cable Indicates a power cable Indicates a signal cable O g...
Page 19: ...commended to recharge the ba eries to 65 75 of the SOC 4 2 Transport During transporta on please follow these guidelines 1 Priority to use the original packaging for transporta on If the original pack...
Page 20: ...mplete or damaged 5 2 1 Scope of Delivery for Inverter Installation Inverter Inverter X1 TOP Cover X1 Right Cover X1 Le Support Foot X1 cable Cover X1 Right Support Foot X1 PV PV Connectors X3 Grid Co...
Page 21: ...stalla on Guide X1 System Wiring Diagram sheets X1 WiFi Module X1 6 Pin AUX Terminal Block X2 Wrench Tool X1 Screws and Terminals Set X1 Backup Connector X1 BAT Connector X2 Commissioning Guide Report...
Page 22: ...X5 Flange nut M5 X6 Quick Installa on Guide X1 Y type terminal X1 Large gasket screw M5 12 X3 Accessories for Base unit op onal Base Unit X1 Bracket for base X1 Bracket for top ba ery X1 Small gasket...
Page 23: ...tem must be mounted in a well ven lated environment to ensure good heat dissipa on When mounted under direct sunlight the power of the system may be derated due to addi on al temperature rise Mount th...
Page 24: ...rewdriver torque range 0 5 N m L 200mm Disassembly and Assembly Tool of PV connector Hammer drill with a 10 mm drill bit 5 4 Preparing Tools and Instruments 5 3 5 Mounting Space Requirements Reserve s...
Page 25: ...ggles Measuring tape Bubble or digital level An dust respirator Marker Flat Head Screwdriver Socket Wrench 1 2 75mm SW 8 5 5 Mounting the Product 5 5 1Mounting the Battery ES BAT 4 8S 1 Wall bracket i...
Page 26: ...m 5 6 a This recommended value is for the loca on which is the middle hole of the wall bracket for the bo om ba ery NOTICE b Ensure that the wall bracket is mounted horizontally using a spirit level b...
Page 27: ...on moun ng or disassembling may lead to injuries Transport and li the ba ery carefully Take the weight of the product into account Always have two or more people to mount and disassemble the product...
Page 28: ...he le edge of the front cover carefully li the ba ery forward and o the wall bracket slide Close 1 2 Base Installa on Op onal 1 2 3 4 X2 2 5Nm T20 SW8 Level S W 1 6 S W 1 6 Ensure that the base is mou...
Page 29: ...2 5Nm T20 5 6 1 5Nm T20 2 5Nm T20 7 8 2 5Nm T20 2 5Nm T20 2 1 2 5Nm T20 9 10 11 12 25...
Page 30: ...on which is the middle hole of the wall bracket for the bo om ba ery For moun ng mul ple ba eries please follow as above steps If you will install extra ba eries by side please keep the distance betwe...
Page 31: ...may result in electric shocks NOTICE The cable colors shown in the electrical connec on diagrams provided in this chapter are for refer ence only Select cables in accordance with local cable speci ca...
Page 32: ...dard network cable in the industry recom mended type Cat5e FTP UV resistant for outdoor use 0 12 0 2 mm2 AWG26 AWG24 4 6 mm Purchased by the installer 6 3 Mul ple core outdoor shielded twisted pair ca...
Page 33: ...tem must be connected to the u lity grid via a separate residual current device You must protect each inverter with an individual grid backup circuit breaker in order to ensure that the inverter can b...
Page 34: ...da on for 8kW Max Current 23 2A 17 4A Breaker Type for 8kW 32A 25A Recommend cable cross sec on 4 6mm 4 6mm Descrip on Grid Side Backup Side AC connec on recommenda on for 10kW Max Current 29A 21 7A B...
Page 35: ...s shown 1 1 2 2 3 3 Remove the female end of the cable to unlock the account Use the flat head screwdriver installation icon to flip the unlock lock Turn the lock counterclockwise as shown Remove the...
Page 36: ...L3 N PE 25 6B G 24 3A G W L2 RJ45 A B L1 Grid DTSU666 3 230V 3 5 80 A 2 32 5 35 8 38 11 12 ESC 3 6 9 10 1 4 7 10 13 14 16 17 19 21 24 25 k W h SET GRID METER DTSU666 METER BMS RS485 DRM RRCR LAN AUX1...
Page 37: ...6 9 10 1 4 7 10 13 14 16 17 19 21 24 25 k W h SET PV METER DTSU666 METER BMS RS485 DRM RRCR LAN AUX1 AUX2 BAT BAT PE N L3 L2 L1 PE N L3 L2 L1 PV3 PV2 PV1 AC Loads 25 6B G 24 3A G W RJ45 A B Op onal L3...
Page 38: ...tman Cloud Step 1 When the system work mode is selected as DC click the bu on under the Grid Meter to turn the Meter icon green When the system work mode is selected as AC or Hybrid click the bu ons u...
Page 39: ...ble gland Take out the ba ery communica on cable from the ba ery package Lead the ba ery communica on cable through the cable gland of the COM connec on cover of inverter don t ghten the swivel nuts o...
Page 40: ...ity red cable is for ba ery posi ve BAT BAT Inverter side Battery side BAT BAT BAT _ Inverter side Battery side BAT 1 2 4 3 5 7 8 6 Battery Inverter BAT BAT _ BMS BMS BAT _ BAT 6 5 2 Electrical Connec...
Page 41: ...e Enabling Device DRED This ensures that the system implements the commands from the grid operator for ac ve power limita on at all mes The system and the Demand Response Enabling Device DRED must be...
Page 42: ...the ba ery power bu ons For more than one parallel ba ery installed please shortly press all power bu ons within 10 seconds For series ba eries please skip this step Step5 Switch on the AC breaker be...
Page 43: ...d cable is connected correctly securely and reliably 39 8 1 Checking Before Power On 08 COMMISSIONING 7 8 9 Switch and breakers status Cable connec ons Unused power terminals The PV switch if there is...
Page 44: ...hole Step 2 Step 1 8 2 1 3 Connect the Grid Backup Connector and Mounting the Cable Cover Grid Backup Step 1 Grid Backup location hole Step 2 Step 3 8 2 2 Installing the Inverter with Wall Bracket Opt...
Page 45: ...rical connec on of energy storage system do the following opera ons Check the voltage range and frequency range of the grid and the installa on of meter without CT Install the top and right decora ve...
Page 46: ...ly set Perform this check when the product is running Once every 6 to 12 months Once every 6 months Once every 6 months Product visible damage Product running status 1 Cables are securely connected 2...
Page 47: ...ther the L cable is connected to the Grounding 2 Restart system if error s ll exists please call the service center 100026 100042 100043 100043 100144 DCI SW Consistency N N Reverse Lost inv_line_shor...
Page 48: ...perature to return to normal above 20 2 If temperature is normal restart system if error s ll exists please call the service center 1 Check whether there is leakage current in system cables 2 If no ab...
Page 49: ...n 580V Use a mul meter to measure the PV terminal voltage 2 Restart system if error s ll exists please call the service center 1 The system installed in Australia needs to check whether N N is short c...
Page 50: ...rter can detect the ba ery open voltage and charge the ba ery NOTE 46 9 2 3 Battery Error Troubleshooting LED Indicator Error Code Descrip on Troubleshoo ng Yellow LEDs on or Yellow LEDs ash once per...
Page 51: ...LEDs on or Yellow LEDs ash once per second 110 2 Packing the Product If the original packaging is available put the product inside it and then seal it using adhesive tape If the original packaging is...
Page 52: ...1 48 Ba ery Voltage Range Maximum Charging Power Maximum Charge discharge current Output AC Back up 90 700 V 6 kW 4 kW 5 kW 8 kW 50 A 50 A Communica on CAN Rated output power Max Apparent Output Power...
Page 53: ...4 11 6 10 kW 50 60 Hz Max input current 14 5 Output AC Grid side 49 EU E ciency 97 5 97 5 97 3 97 3 97 3 E ciency Max E ciency 98 98 97 8 97 8 Opera on Phase Rated Grid Voltage Grid Voltage Range Ra...
Page 54: ...otec on Integrated Integrated 50 Dimensions W H D Weight Topology Opera on Temperature Range Ingress Protec on Noise Emission Cooling Concept Max Opera on Al tude Grid Connec on Standard Transformerle...
Page 55: ...Plug in connector Amphenol H4 connectors Vaconn D4 connectors Plug in connector 51 11 2 Datasheet of Battery Model Ba ery type Weight Dimension W D H Ingress protec on Energy capacity Usable capacity...
Page 56: ...ring Diagram with Electricity Meter DTSU666 Without CT EU Grid P ow erM et er T568B D i rect N et w ork C abl e B M S C O M RJ45 A B L1 L3 N PE L2 L1 L3 L2 L1 N PE RCD 32A DTSU666 3 230V 3 5 80 A S i...
Page 57: ...N L3 L2 L1 B reaker B reaker BAT RCD 32A AC BACKUP RCD PV 412 90019 01 Thi s appl i es t o a P V pl antexi st ed PE N L3 L2 L1 PE N L3 L2 L1 L3 N PE 25 6B G 24 3A G W L2 1 Three Phase Inverter System...
Page 58: ...T BAT PE N L3 L2 L1 Grid RCD 32A BAT 8 8 8 8 kW h PV3 PV2 PV1 AC BACKUP B reaker PV Thi s appl i es t o a P V pl antexi st ed PE N L3 L2 L1 PE N L3 L2 L1 Page 2 412 90019 01 C N PE 25 6B G 24 3A G W B...
Page 59: ...et er B M S C O M RCD C B A C B A Three P hase Loads Three P hase Loads C N PE B A D TS U 666 100 40m A w i t h C T D TS U 666 250 50m A w i t h C T A B C N PE P V I nvert er G R I D C T PE Grid E BA...
Page 60: ...www eastmanworld com marketing eastmanworld com...