24 Operation
Advance the product and film to the seal area on the take away conveyor.
Close the sealing bar using slight pressure and let go. The sealing bar will seal the
product and release automatically according to the sealing time setting.
After the seal head has been released the take away conveyor will move the product
into the shrink tunnel.
Repeat for the next package to be sealed.
As products are moved through the case sealing machine a long tail of scrap will
accumulate on the operator side of the machine. Wind the scrap material around the
two fixed holders.
Note:
During the normal course of operation of the sealer, the seal heads
will require cleaning from time to time. For best results, form a ball
of accumulated scrap sealing film and keep this handy to use to
wipe the sealer when needed.
Shutting Down
When shutting down it is important to let the temperature inside the shrink tunnel cool
down before turning off the main power. See the special notes about the tunnel
shutdown sequence at the end of this section.
Turn the Heater switch to the “OFF” position.
Attention!
Do not turn the conveyor and blower off until the shrink
tunnel has cooled down considerably.
After the temperature in the tunnel has cooled (this will be a considerable
amount of time) turn the Conveyor and Blower off.
Summary of Contents for VS1620
Page 1: ...VS1620 L Sealer Heat Tunnel Combo Value Series User Guide...
Page 2: ......
Page 4: ......
Page 36: ...36 Parts List VS1620 L Sealer Tunnel Combo Unit Main Assembly...
Page 46: ...46 Parts List Heat Tunnel Hood Assembly VSTA0066 VS1620DC...
Page 48: ...48 Parts List L Sealer And Frame VSSA0259 VS1620E...
Page 53: ...Parts List 53 L Sealer Takeaway Conveyor VSSA0261 LTS504B P...
Page 65: ......
Page 66: ......