Operation 19
Check Tension
Check the tape for correct tension.
Tighten or loosen the tape core holder to adjust tension.
Thread Tape
Carefully thread the new tape through the rollers in the tape head as shown in the
applicable diagram in the Tape Head User Guide provided with the tape head.
For convenience, diagrams for threading tape in the Eastey-EX Tape Head and EZ-EX
Tape Head are provided on the following page. Follow the diagram that applies for your
tape head, depending on the tape head model and position on the taper.
Summary of Contents for SB-2EX-Auto
Page 1: ...SB 2 3EX Auto Automatic Case Taping System User Guide...
Page 2: ......
Page 4: ......
Page 16: ...16 Installation Air Supply Line In Air In...
Page 38: ...38 Parts Lists Parts List Electrical 1 19 24 25 30 31 32 Optional Optional...
Page 39: ...Parts Lists 39...
Page 43: ...Parts Lists 43 Side Belts...
Page 46: ...46 Parts Lists Vertical Column with Height Adjustment...
Page 51: ...Parts Lists 51 Machine Body...
Page 53: ...Parts Lists 53 Infeed Index Roller Table...
Page 55: ...Parts Lists 55 Options...
Page 57: ...Appendix A Electrical Schematic 57 Appendix A Electrical Schematic...
Page 58: ...58 Appendix A Electrical Schematic Electrical Schematic Continued...
Page 59: ...Appendix A Electrical Schematic 59 Electrical Schematic Continued...
Page 60: ...60 Appendix A Electrical Schematic Electrical Schematic Continued...
Page 61: ...Appendix A Electrical Schematic 61 Electrical Schematic Continued...
Page 62: ...62 Appendix A Electrical Schematic Electrical Schematic Continued...
Page 66: ......
Page 67: ......