Operation 19
Operation
The Eastey L-Bar Sealing Machine is very easy to operate. Become familiar with the
control panel and timers located on the operator side of the machine.
Tunnel Operation
Main Power
To begin operation turn,
the “Main Switch” to the “ON”
position.
The “Main Switch” controls power for both the
tunnel and sealer.
Emergency Stop
E-STOP
Energizing Seal Band
Time Adjustment*
*See Caution.
Summary of Contents for L-Bar Sealer Tunnel Combo Unit Value Series
Page 1: ...VS1620 L Bar Sealer Tunnel Combo Unit Value Series User Guide ...
Page 2: ......
Page 4: ......
Page 7: ......
Page 36: ...36 Parts List ElectricalSchematic Sheet1of2 ...
Page 37: ...Parts List 37 ElectricalSchematic Sheet2of2 ...
Page 38: ...38 Parts List VS1620 L Sealer Tunnel Combo Unit MainAssembly ...
Page 48: ...48 Parts List HeatTunnelOuterJacket VS1620DC ...
Page 50: ...50 Parts List L SealerAndFrame VS1620E ...
Page 54: ...54 Parts List L SealerTakeawayConveyor LTS504B P ...
Page 61: ......
Page 62: ......