TXV–CLP-KIT (07/15)
Page 23
Step 2: Position
the Pressure Equalizer Tee
on the suction tube at least 10 inches downstream
from the 90° ell as shown in Figure 12. Remove the core from Schrader valve on the Tee.
Figure 12. Positioning the Pressure Equalizer Tee