background image

                  CREATED ON: May 06, 2016

 

1.

 

Top Display Window 

2.

 

HOLD button 

3.

 

Scroll button 

                                                

Instruction Manual

 

 

 

 

 

EMS-14 

Power Factor Meter  

                                         

 

                            

 

                                                                      

                                                              

EAPL 

 

 

 

    Introduction 

1.

 

Connect 3 phase 4 wire voltage and current circuit as per the       

            connection diagram. 
        2. Connect rated auxiliary supply at terminal 15 & 16. 
        3. Moment voltage is applied on auxiliary terminal, display starts showing   
            PF parameter one by one in auto scaling mode. 
        4. When power factor is leading  

 

Display shows negative sign 

 

Lead LED glows 

        5. When power factor is lagging then LAG LED glows

  

  

PARAMETER 

SEQUENCE 

LED 

TPF 

R-POWER FACTOR 

ON 

OFF 

OFF 

OFF 

Y- POWER FACTOR 

OFF 

ON 

OFF 

OFF 

B- POWER FACTOR 

OFF 

OFF 

ON 

OFF 

TOTAL - POWER 

FACTOR 

OFF 

OFF 

OFF 

ON 

 

 

 

 

 

 

Box Accessories

 

      One (1) EMS-14 digital meter         
      One (1) Instruction Manual 
      One (1) test report   
       Side Anchor (2 nos.) 

 

Safety Precautions

 

Read and follow all the safety precautions and instructions before installing 
and working with the equipment. 

                           !   

DANGER 

HAZARD OF ELECTRIC SHOCK, EXPLOSION OR ARC FLASH 

 

Apply appropriate personal protective equipment(PPE) and follow safety 
work practices 

 

Only qualified electrical workers should install this equipment. Such work 
should be performed only after reading this entire set of instructions. 

 

If the equipment is not used in the manner specified by the manufacturer, 
the protection provided by the equipment may be impaired. 

 

NEVER work alone. 

 

Turn OFF all power supplying the meter and the equipment in which it is 
installed before working on it. 

 

The successful operation of this equipment depends upon proper 
handling, installation and operation. Neglecting fundamental installation 
requirements may lead to personal injury as well as damage to electrical 
equipment or other property. 

 

NEVER bypass external fusing.

 

 

 

NEVER short the secondary of PT 

 

NEVER open circuit a CT; use the shorting block to short circuit the leads of 
CT before removing the connection from meter. 

 

Before performing Dielectric or Megger testing on any equipment in which 
the meter is installed, disconnect all the input and output wires to the 
meter. High voltage testing may damage electronic components 
contained in the meter. 

 

The meter should be installed in a suitable electrical enclosure. 

Failure to follow these instructions will result in death or serious injury.

 

 

EAPL is not responsible for any consequential damages arising out of

 

use 

of our products, though the technology is cautiously chosen and 
implemented like any other well designed good electric meter. 

Installation

 

Connecting cable recommendations

 

 

Insulation rating 

Current rating 

Voltage circuit 

>600 VAC 

> 0.1A 

Current circuit 

>600 VAC 

>7.5A/2.5mm

2

14AWG minimum 

 

Tools and Fasteners 

Kindly use star – type screw driver for tightening the screws. 
 

NOTE:

 Installation should include a disconnecting device, like switch or 

circuit breaker, with clear ON/OFF markings, to turn-off the auxiliary supply 
(control power).The disconnecting device should be within the reach of the 
equipment and the operator

.

 

 

 

Dimension 

      

 

 

Note: All Dimensions are in mm. 

Front Panel 

 

 

 

 

 

 

 

Rear Panel 

 

  

OD RE YN 670001 REV 01/06-05-16

 

Page 1 of 2 